We (@redford, @mrtick and I) have reverse engineered the PLC code of NEWAG Impuls EMUs. These trains were locking up for arbitrary reasons after being serviced at third-party workshops. The manufacturer argued that this was because of malpractice by these workshops, and that they should be serviced by them instead of third parties.

  • rustyricotta@lemmy.ml
    link
    fedilink
    English
    arrow-up
    4
    ·
    1 year ago

    The McDonald’s ice cream machines have a similar vibe, but that doesn’t seem to be as smartly/evilly executed as these trains. Remote kill switches are insane.